Price Price on application
Details | |
---|---|
Weight (kg) |
|
Transport length (mm) |
|
Inclination angle max. (°) |
|
Width (mm) |
|
Number of steps / rungs (pcs) |
|
Inclination angle min. (°) |
|
Key Features
Between storeys, with units, to (system) scaffolding, formwork walls, etc. stairs with 24 steps or more must be fitted with a combination beam Flights of stairs with 18 and 21 steps must have a universal support. Flights of stairs can be joined together. Meets the EN-128811 standard for temporary building site equipment.
All rates excl. 21% VAT. They also exclude costs for the following: maintenance, fuel, oil, wear and tear, transport, cleaning, accessories and various attachments, any environmental taxes and surcharges for damage waiver and fire/theft schemes.
Rates are based on daily rates or weekly rates, unless a machine has an hour counter. In this situation, the daily rate is based on 8 operating hours and the weekly rate on 40 operating hours.
A surcharge applies for additional operating hours. The weekend rates (Friday to Monday inclusive) are based on use at the weekend. For more information please check Hiring: how it works.